Home > Projects > George Bolt Memorial Drive Roundabout

George Bolt Memorial Drive Roundabout

This project consists of a three-lane roundabout in the centre of George Bolt Memorial Drive.  As a Level 3 State Highway with 40,000VPD, comprehensive traffic management planning and stakeholder liaison activities were key to ensure that no delays were experienced by airport users and traffic continued to flow.

Some aspects of the scope of works include site clearance, installation of 2.5km of ducting, trenching and shoring of services, watermain installation, roading (including pavements, kerb and channelling and footpaths) and stormwater drainage. 

 

For information about similar projects, check out:

Ray Emery Drive Relocation

Airport Terminal Forecourt Upgrades

New Lynn TOD

Tiverton / Wolverton Route Improvements

 

CLIENT TESTIMONIAL

“Dempsey Wood demonstrated good planning and execution of the work achieving a high standard of workmanship with good outcomes. Management of health and safety, traffic control and contract administration were all of a high standard. Throughout the contract Dempsey Wood maintained a good working relationship with the Road Controlling Authority, the Engineer and the Principal.” Bob Alexander, Project Engineer, CPG NZ Ltd (formerly Duffill Watts & King).

Dempsey Wood Civil Contractors Limited, PO Box 244-84, Royal Oak, Auckland 1345, New Zealand. P + 64 9 571 2050 F + 64 9 571 2051 E reception@dempseywood.co.nz